Lightweight hall in the hospital courtyard with full building services

An interim kitchen with a direct connection to the existing building was constructed in 2025 to supply a hospital. The solution ensures the preparation and serving of meals for patients and staff over a period of 16 months.

Data & Facts

Operating period: 16 months
Completion: March 2025
Catering for 250 patients (breakfast, lunch, dinner)
Plus around 200 staff meals per day
Air conditioning and supply and exhaust air system
Anchor-free, self-supporting construction
Planning, hygiene, workplace guidelines, connection to existing building

 

Highlights

 

Temporary kitchen for patient and staff catering
Lightweight hall in the courtyard with direct connection to the building
Installation without floor anchoring – self-supporting construction

 

Challenging courtyard as a location

The construction of the temporary kitchen in the courtyard posed particular challenges in terms of logistics, construction and infrastructure. The lightweight hall was designed as an anchor-free system and erected on site without any alterations to the existing building. The direct connection ensures uninterrupted supply to the building.

Planning in accordance with hygiene and workplace guidelines

The temporary kitchen meets all necessary hygiene, food safety and workplace guidelines. Air conditioning and a compliant supply and exhaust air system ensure safe and efficient operation in line with hospital standards.

Meticulous preparation – smooth implementation

The successful implementation of the project was based on professional preparation by the client and the planning office, as well as cross-trade implementation planning coordinated by Telia. Compliance with all deadlines and operational requirements was crucial for the sensitive hospital operations – and was reliably fulfilled.