Efficient modular hall

In 2023, an efficient modular hall was constructed over 24 months for Stromnetze Hamburg. With a capacity to serve 900 people, this versatile facility caters to everything from breakfast to corporate events.

Referenzbild Stromnetze Hamburg

DATA FACTS

Project duration: 24 months

Capacity of up to 900 guests

Versatile services: Breakfast, lunch, corporate events

Modular hall dimensions: 30 m span and 65 m length

Effective climate control: Heat recovery and compliant ventilation

 

HIGHLIGHTS

 

Innovative 24-month temporary solution

Modular hall for optimal space utilization

Attractive garden seating for 150 guests

Seamless connection to existing utilities

Referenzbilder Projekt MTU
For maximum flexibility

Sustainable modular hall

The challenge of this project was to ensure smooth 24-month temporary operations for Stromnetze Hamburg. To achieve this, a modular hall with an impressive 30-meter span and 65-meter length was designed. With an eave height of 5.2 meters, the cafeteria provides ample space and optimal conditions for sustainable and efficient climate control. Compliance with workplace regulations was achieved through a ventilation system with heat recovery, ensuring conforming supply and exhaust air.

Referenzbild Stromnetze Hamburg
A feast for the eyes

Attractive garden seating

Beyond its functional design, special emphasis was placed on creating a pleasant atmosphere. A garden with 150 well-designed seats offers employees of Stromnetze Hamburg a delightful setting to enjoy their meals.

Referenzbild Stromnetze Hamburg
Customer partner

Seamless collaboration for optimum results

A remarkable aspect of this project was the smooth support provided to the client. The prepared building sites, existing utility connections, and sewage systems significantly facilitated the integration of the cafeteria. Throughout the construction phase, all on-site workers were well catered for, highlighting the importance of employee well-being. The successful public tender win alongside our system partner, Much from Limburg an der Lahn, was a particular highlight. This project showcases our expertise in delivering tailored solutions for demanding environments, emphasizing our commitment to creating efficient, high-quality spaces.

Further reference projects

Explore more of our successful projects, where our custom professional kitchens have provided perfect solutions for various events and temporary needs.

All reference projects

Pop-up kitchen for the Austrian Chefs’ Association

Prime at Prater

Telia provided a fully equipped pop-up kitchen for a public cooking event organised by the Austrian Chefs’ Association. The appliances came from Telia’s rental equipment pool and were delivered and handed over ready for use.

Food service in the event area of the ADAC headquarters

ADAC headquarters

During the renovation of the existing dining hall, Telia set up a temporary food service area in the auditorium event area of the ADAC headquarters. The solution includes the planning and implementation of food service, regeneration kitchen and logistics areas.

Production kitchen with decentralised food distribution

Schütz

A temporary kitchen for staff catering has been set up at the Schütz headquarters in Selters. It will be in operation for 36 months. Telia is responsible for planning and implementing the technical building equipment and all the commercial kitchen technology.

Lightweight hall in combination with container solution

Brenner opera grill

An interim kitchen with extended storage capacity was implemented for the renovation of the Brenner Operngrill. The Brenner Operngrill is considered one of the top addresses in Munich.

Supply solution for emergency shelter in the Federal State of Bavaria

Emergency Shelter Warngau

A fully equipped temporary canteen was set up for an emergency shelter run by the Federal state of Bavaria. The facility provides meals for around 500 people every day, who are housed in a modular container facility for 24 months.

Lightweight hall in the hospital courtyard with full building services

Franziskus Spital in Wien

An interim kitchen with a direct connection to the existing building was constructed in 2025 to supply a hospital. The solution ensures the preparation and serving of meals for patients and staff over a period of 16 months.

Temporary kitchen for an existing dining hall

ENGEL AUSTRIA GmbH

Engel, the global leader in polymer injection molding machines, expanded its headquarters in Schwertberg, Austria, by adding new production halls. During this expansion, the existing kitchen and buffet line serving 900 guests daily were replaced with a temporary kitchen.

Temporary restaurant with bakery and patisserie

Procter & Gamble DACH-Headquarter

The fire safety measures at Procter & Gamble’s DACH headquarters, including the canteen, were brought up to the latest standards. As an incentive for employees, the client packaged the interim solution in an attractive concept.

Stylish cafeteria for Swiss Krono

Swiss Krono

In 2020, Swiss Krono’s cafeteria was upgraded with a stylish temporary kitchen that prioritized energy efficiency and strict construction regulations.

Revolutionary cafeteria solution for Knorr Bremse

Knorr Bremse

Over 17 months, the revolutionary cafeteria solution for Knorr Bremse was implemented, ensuring daily service for 1,600 guests in a 2,600-square-meter modular hall.

Innovative canteen infrastructure

MTU Aero Engines AG

The innovative solution for the canteen infrastructure – MTU Aero Engines AG had a project duration of 24 months. The daily catering for 2,700 people was provided with a full range of meals – breakfast, lunch and company events.

High-performance catering at Oktoberfest

Käfer Wiesn-Schänke

At the world’s largest folk festival, Feinkost Käfer combines the highest culinary standards with high footfall around the clock. For many years, Telia has been providing comprehensive kitchen technology services here, as it does for other leading Oktoberfest businesses.